Re: 600 lose jobs at Arcelor Mital

Postby zoom rader » July 26th, 2024, 8:52 pm

sMASH wrote:Where they getting the gas to supply the energy ?
Out of Rowlee arse

But they only use a small amount gas for the rolling mills.

Its where power gen getting the gas from as the mill uses arc furnaces

User avatar
sMASH
TunerGod
Posts: 25586
Joined: January 11th, 2005, 4:30 am

Re: 600 lose jobs at Arcelor Mital

Postby sMASH » July 27th, 2024, 7:42 am

zoom rader wrote:
sMASH wrote:Where they getting the gas to supply the energy ?
Out of Rowlee arse

But they only use a small amount gas for the rolling mills.

Its where power gen getting the gas from as the mill uses arc furnaces
That's what I mean . Niquan was down also cause lack of gas.
The heat wave the other day had ttec sweating to supply. What gonna be the stories when time to switch on the electrodes .

Might hadda cover the site in solar panels and only run it in the day

User avatar
wing
punchin NOS
Posts: 2778
Joined: December 17th, 2008, 6:57 pm

Re: 600 lose jobs at Arcelor Mital

Postby wing » July 27th, 2024, 8:58 am

TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?

User avatar
wing
punchin NOS
Posts: 2778
Joined: December 17th, 2008, 6:57 pm

Re: 600 lose jobs at Arcelor Mital

Postby wing » July 27th, 2024, 9:03 am

zoom rader wrote:
wing wrote:Acquisition completed. Operations to commence in 12 months.
Election gimmick
Couva South gone PNM.....

User avatar
zoom rader
TunerGod
Posts: 30518
Joined: April 22nd, 2003, 12:39 pm
Location: Grand Cayman

Re: 600 lose jobs at Arcelor Mital

Postby zoom rader » July 27th, 2024, 9:05 am

wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
TTEC is a badly managed under PNM and should not have to rely on the steel mill to pay its bills.

Laventille & Beetham steal electricity and PNM dare dont cut those supplies.

But ramlal in penal gets cut for 1 day late payment

User avatar
zoom rader
TunerGod
Posts: 30518
Joined: April 22nd, 2003, 12:39 pm
Location: Grand Cayman

Re: 600 lose jobs at Arcelor Mital

Postby zoom rader » July 27th, 2024, 9:06 am

wing wrote:
zoom rader wrote:
wing wrote:Acquisition completed. Operations to commence in 12 months.
Election gimmick
Couva South gone PNM.....
Keep dreaming

User avatar
sMASH
TunerGod
Posts: 25586
Joined: January 11th, 2005, 4:30 am

Re: 600 lose jobs at Arcelor Mital

Postby sMASH » July 27th, 2024, 9:39 am

zoom rader wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
TTEC is a badly managed under PNM and should not have to rely on the steel mill to pay its bills.

Laventille & Beetham steal electricity and PNM dare dont cut those supplies.

But ramlal in penal gets cut for 1 day late payment
Yes, they have excessive capacity ... But not excessive gas...
Ent one of the lng trainz still mothballed too.

Ent methanex shut down titan cause not enough gas and let atlas use what available ?
Ent they renegotiate gas contract and shut down atlas instead , switching to the smaller titan .

Peddle ur street level propaganda to the Lefffff foot ritttttte foot community

User avatar
Supra GT-FOUR
Sweet on this forum
Posts: 253
Joined: April 30th, 2004, 10:46 pm
Location: Mango Tree

Re: 600 lose jobs at Arcelor Mital

Postby Supra GT-FOUR » July 27th, 2024, 10:01 am

wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?

Gladiator
punchin NOS
Posts: 3931
Joined: April 20th, 2006, 9:43 am

Re: 600 lose jobs at Arcelor Mital

Postby Gladiator » July 27th, 2024, 10:21 am

wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?


You are one delusional excuse for a human...LOL

User avatar
zoom rader
TunerGod
Posts: 30518
Joined: April 22nd, 2003, 12:39 pm
Location: Grand Cayman

Re: 600 lose jobs at Arcelor Mital

Postby zoom rader » July 27th, 2024, 10:51 am

Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
U have to be skilled to work on the estate, a cleaner is not a skilled employee or contractor.

Most times he talks total trash not knowing that other ppl can spot his bullŞhit

User avatar
wing
punchin NOS
Posts: 2778
Joined: December 17th, 2008, 6:57 pm

Re: 600 lose jobs at Arcelor Mital

Postby wing » July 27th, 2024, 10:58 am

Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR

User avatar
sMASH
TunerGod
Posts: 25586
Joined: January 11th, 2005, 4:30 am

Re: 600 lose jobs at Arcelor Mital

Postby sMASH » July 27th, 2024, 12:06 pm

wing wrote:
Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR
He work in the briquettes plant

User avatar
zoom rader
TunerGod
Posts: 30518
Joined: April 22nd, 2003, 12:39 pm
Location: Grand Cayman

Re: 600 lose jobs at Arcelor Mital

Postby zoom rader » July 27th, 2024, 1:03 pm

It is a plus that the Mill will be back up.


But the new board looks very much PNM and i suspect that pnm appointed workers will be employed as square pegs in round holes again.

I worked in the then ISCOTT to ISPATT in the late 1980s to 1998. One of the biggest problems on ISCOTT failure was marketing abroad and low skilled employees. In the early 1980s the pnm actuality hired ppl from the streets as skilled men when most had no qualifications. One rolling mill operator could hardly read and write. Managers where bearly supervisors and had poor leadership skills. Other problem was the steel workers trade union was actuality a PNM trade union and had no interest in workers.

It was only when ISPATT took over that they employed qualified engineers directly from UWI and the then San Fernando technical Institute as techs. Plus ISPATT had some very bright Indian Indians as engineers & Managers . They expanded meltshop & baghouse and had the marketing that they needed. At that time it was a good place to learn. In 1998 i smell the rat and decided it was time to leave as i knew it was time to move on.

Was good memories working there.

User avatar
Supra GT-FOUR
Sweet on this forum
Posts: 253
Joined: April 30th, 2004, 10:46 pm
Location: Mango Tree

Re: 600 lose jobs at Arcelor Mital

Postby Supra GT-FOUR » July 27th, 2024, 2:52 pm

wing wrote:
Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.

User avatar
wing
punchin NOS
Posts: 2778
Joined: December 17th, 2008, 6:57 pm

Re: 600 lose jobs at Arcelor Mital

Postby wing » July 27th, 2024, 3:25 pm

Supra GT-FOUR wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.

User avatar
zoom rader
TunerGod
Posts: 30518
Joined: April 22nd, 2003, 12:39 pm
Location: Grand Cayman

Re: 600 lose jobs at Arcelor Mital

Postby zoom rader » July 27th, 2024, 4:11 pm

wing wrote:
Supra GT-FOUR wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.
Bullśhit u talking nonsense


U can cant start meltcast without a suppy of DRI and or scrap.

What u gonna melt air ?

User avatar
wing
punchin NOS
Posts: 2778
Joined: December 17th, 2008, 6:57 pm

Re: 600 lose jobs at Arcelor Mital

Postby wing » July 27th, 2024, 4:33 pm

zoom rader wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.
Bullśhit u talking nonsense


U can cant start meltcast without a suppy of DRI and or scrap.

What u gonna melt air ?
They will be using scrap. The dri will come after the refurbishment of the DR plants. You really should try to think before you type. It's a private company that happens to get approval from the PNM government. You rather it failed and deny jobs just because your daddy molested you and somehow you blame the PNM for everything.

User avatar
zoom rader
TunerGod
Posts: 30518
Joined: April 22nd, 2003, 12:39 pm
Location: Grand Cayman

Re: 600 lose jobs at Arcelor Mital

Postby zoom rader » July 27th, 2024, 6:58 pm

wing wrote:
zoom rader wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.
Bullśhit u talking nonsense


U can cant start meltcast without a suppy of DRI and or scrap.

What u gonna melt air ?
They will be using scrap. The dri will come after the refurbishment of the DR plants. You really should try to think before you type. It's a private company that happens to get approval from the PNM government. You rather it failed and deny jobs just because your daddy molested you and somehow you blame the PNM for everything.
Dummy, u cant use all scrap.

The grade of steel will fail according to the order of the grade. Steel is made is different grades ( DO8, D09 ect) depending on the carbon content and the pure DRI that they use for the chemistry composition.
Meltshop & Meltcast are not the same.
Before meltcast they will also need the full lab to analyze the composition.
Addition composition materials will also have to brought which require a procurement department. Lime plant will also need to be up and running.

The mill also made steel for welding rods and its why DRI is needed as high grade steel.

Clearly u know nothing about the steel making progress. Ur level of debating is that of a child.
Last edited by zoom rader on July 27th, 2024, 6:58 pm, edited 2 times in total.

User avatar
sMASH
TunerGod
Posts: 25586
Joined: January 11th, 2005, 4:30 am

Re: 600 lose jobs at Arcelor Mital

Postby sMASH » July 27th, 2024, 7:13 pm

zoom rader wrote:
wing wrote:
zoom rader wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.
Bullśhit u talking nonsense


U can cant start meltcast without a suppy of DRI and or scrap.

What u gonna melt air ?
They will be using scrap. The dri will come after the refurbishment of the DR plants. You really should try to think before you type. It's a private company that happens to get approval from the PNM government. You rather it failed and deny jobs just because your daddy molested you and somehow you blame the PNM for everything.
Dummy, u cant use all scrap.

The grade of steel will fail according to the order of the grade. Steel is made is different grades ( DO8, D09 ect) depending on the carbon content and the pure DRI that they use for the chemistry composition.
Meltshop & Meltcast are not the same.
Before meltcast they will also need the full lab to analyze the composition.
Addition composition materials will also have to brought which require a procurement department. Lime plant will also need to be up and running.

Clearly u know nothing about the steel making progress. Ur level of debating is that of a child.
Zoom 100% recycled material boi!


Get with the program , they doing green steel.

Wtf lol

User avatar
wing
punchin NOS
Posts: 2778
Joined: December 17th, 2008, 6:57 pm

Re: 600 lose jobs at Arcelor Mital

Postby wing » July 27th, 2024, 9:40 pm

zoom rader wrote:
wing wrote:
zoom rader wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:TGU has excess capacity as well as if the MELT SHOP really gets up and running, ttec will be better able to pay it's bills, then there won't be any need for the light bill increase? Maybe that's why they delayed implementing it?
What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.
Bullśhit u talking nonsense


U can cant start meltcast without a suppy of DRI and or scrap.

What u gonna melt air ?
They will be using scrap. The dri will come after the refurbishment of the DR plants. You really should try to think before you type. It's a private company that happens to get approval from the PNM government. You rather it failed and deny jobs just because your daddy molested you and somehow you blame the PNM for everything.
Dummy, u cant use all scrap.

The grade of steel will fail according to the order of the grade. Steel is made is different grades ( DO8, D09 ect) depending on the carbon content and the pure DRI that they use for the chemistry composition.
Meltshop & Meltcast are not the same.
Before meltcast they will also need the full lab to analyze the composition.
Addition composition materials will also have to brought which require a procurement department. Lime plant will also need to be up and running.

The mill also made steel for welding rods and its why DRI is needed as high grade steel.

Clearly u know nothing about the steel making progress. Ur level of debating is that of a child.
I see you have learnt to use the internet to appear intelligent. However I have called you out numerous times and thus you are labelled as a well developed kant and jackass of the highest order. As for your kakahole partner the ivermectin addict, well you both deserve each other. Maybe a lil home invasion will knock some sense into you both.

K_J_R
3NE 2NR for life
Posts: 246
Joined: January 11th, 2015, 12:43 pm

Re: 600 lose jobs at Arcelor Mital

Postby K_J_R » July 27th, 2024, 11:22 pm

wing wrote:
zoom rader wrote:
wing wrote:
zoom rader wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:
Supra GT-FOUR wrote:What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.
Bullśhit u talking nonsense


U can cant start meltcast without a suppy of DRI and or scrap.

What u gonna melt air ?
They will be using scrap. The dri will come after the refurbishment of the DR plants. You really should try to think before you type. It's a private company that happens to get approval from the PNM government. You rather it failed and deny jobs just because your daddy molested you and somehow you blame the PNM for everything.
Dummy, u cant use all scrap.

The grade of steel will fail according to the order of the grade. Steel is made is different grades ( DO8, D09 ect) depending on the carbon content and the pure DRI that they use for the chemistry composition.
Meltshop & Meltcast are not the same.
Before meltcast they will also need the full lab to analyze the composition.
Addition composition materials will also have to brought which require a procurement department. Lime plant will also need to be up and running.

The mill also made steel for welding rods and its why DRI is needed as high grade steel.

Clearly u know nothing about the steel making progress. Ur level of debating is that of a child.
I see you have learnt to use the internet to appear intelligent. However I have called you out numerous times and thus you are labelled as a well developed kant and jackass of the highest order. As for your kakahole partner the ivermectin addict, well you both deserve each other. Maybe a lil home invasion will knock some sense into you both.



watch nah you wishin dat on people?????

allyuh wicked here yes.

User avatar
sMASH
TunerGod
Posts: 25586
Joined: January 11th, 2005, 4:30 am

Re: 600 lose jobs at Arcelor Mital

Postby sMASH » July 28th, 2024, 6:37 am

K_J_R wrote:
wing wrote:
zoom rader wrote:
wing wrote:
zoom rader wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.
Bullśhit u talking nonsense


U can cant start meltcast without a suppy of DRI and or scrap.

What u gonna melt air ?
They will be using scrap. The dri will come after the refurbishment of the DR plants. You really should try to think before you type. It's a private company that happens to get approval from the PNM government. You rather it failed and deny jobs just because your daddy molested you and somehow you blame the PNM for everything.
Dummy, u cant use all scrap.

The grade of steel will fail according to the order of the grade. Steel is made is different grades ( DO8, D09 ect) depending on the carbon content and the pure DRI that they use for the chemistry composition.
Meltshop & Meltcast are not the same.
Before meltcast they will also need the full lab to analyze the composition.
Addition composition materials will also have to brought which require a procurement department. Lime plant will also need to be up and running.

The mill also made steel for welding rods and its why DRI is needed as high grade steel.

Clearly u know nothing about the steel making progress. Ur level of debating is that of a child.
I see you have learnt to use the internet to appear intelligent. However I have called you out numerous times and thus you are labelled as a well developed kant and jackass of the highest order. As for your kakahole partner the ivermectin addict, well you both deserve each other. Maybe a lil home invasion will knock some sense into you both.



watch nah you wishin dat on people?????

allyuh wicked here yes.
When don't kno how a steel plant works u have to resort to home invasion ... Lol
TriniTuner-906499705.jpg

User avatar
zoom rader
TunerGod
Posts: 30518
Joined: April 22nd, 2003, 12:39 pm
Location: Grand Cayman

Re: 600 lose jobs at Arcelor Mital

Postby zoom rader » July 28th, 2024, 8:21 pm

wing wrote:
zoom rader wrote:
wing wrote:
zoom rader wrote:
wing wrote:
Supra GT-FOUR wrote:
wing wrote:
Supra GT-FOUR wrote:What department did you work in at Mittal?
Central services?
DR
Nice I worked in Meltcast.
Melt shop will be restarting first. Look out for the call.
Bullśhit u talking nonsense


U can cant start meltcast without a suppy of DRI and or scrap.

What u gonna melt air ?
They will be using scrap. The dri will come after the refurbishment of the DR plants. You really should try to think before you type. It's a private company that happens to get approval from the PNM government. You rather it failed and deny jobs just because your daddy molested you and somehow you blame the PNM for everything.
Dummy, u cant use all scrap.

The grade of steel will fail according to the order of the grade. Steel is made is different grades ( DO8, D09 ect) depending on the carbon content and the pure DRI that they use for the chemistry composition.
Meltshop & Meltcast are not the same.
Before meltcast they will also need the full lab to analyze the composition.
Addition composition materials will also have to brought which require a procurement department. Lime plant will also need to be up and running.

The mill also made steel for welding rods and its why DRI is needed as high grade steel.

Clearly u know nothing about the steel making progress. Ur level of debating is that of a child.
I see you have learnt to use the internet to appear intelligent. However I have called you out numerous times and thus you are labelled as a well developed kant and jackass of the highest order. As for your kakahole partner the ivermectin addict, well you both deserve each other. Maybe a lil home invasion will knock some sense into you both.
No idiot

I called u out on not knowing the steel making progress. Go back and read this chead from the start.