Postby Reez100 » September 7th, 2009, 2:25 pm
you will need to rewire that one room which comprises of separate panel, separate main cable,installation of two way splitter then u have to produce an inspection certificate to carry into ttec, they would do a survey to ensure that the new installation is commercial or residential,then they would install the separate meter for you