aight beyotches here's the progress:
both engines out and on the ground, will take pices tomorrow
the intercooler has been installed, suspension kinda out, shifter
pedals mounted already.
ran into some problems but i am coping
have to change rims (i really doh have dat kinda cash)
pressah tuh find drop spring dong here so gonna have tuh chop for the hour (i really, until i can bring them in (didn't wanna do this 2)
most everything lines up (more or less).
a front cut is VERY heavy bwoy, no joke. I ketch MEH ASS tuh move
it from belmont using a cherry picker, a van, some rope, 2 jacks and
some other ratch stuff to south. but it's a learing process
BTW 323 if yuh looking for a KL-ZE engine there is 1 by the guy who i bought mines from and there is one in a blue 626 for sale currently. Or you can go 2.2 instead.
Cyar wait tuh ;earn the car proper jed. Ah BROKES but EXCITED
pres doh frighten ah coming fuh yuh jess now
kat nice project man