Moderator: 3ne2nr Mods
Gladiator wrote:Built a 50ft wall about 3 yrs ago with concrete bricks and cost was around $28k material and labour.
supercharged turbo wrote:What height?Gladiator wrote:Built a 50ft wall about 3 yrs ago with concrete bricks and cost was around $28k material and labour.
rspann wrote:50 ft perimeter wall? Dan, why you buy a small piece of land so?
Gladiator wrote:Built a 50ft wall about 3 yrs ago with concrete bricks and cost was around $28k material and labour.
screwbash wrote:da about wah 250 /300 blocks plus post and trench ? for $25000. how allyuh cud pay dat an allow men tuh dig out yuh eye. it have real Spanish here that doing that wuk, local wah charge $350 ah day for a labourer and dem spanish doing it for $150 /$200 and dey wuking and going to a next wuk, dem aint stopping for lunch for ah hour or running by the shop every minute like locals. local wah charge me $4000 labour to put up two block height, full with dirt and concrete a floor 17'x10' and the man take 4 days to do the wuk, next piece same size ah give 2 spanish pay them $200 ah day and dey take 2 half days and floor concrete for $1200 labour.
EFFECTIC DESIGNS wrote:^ Who the fck is MaxiPad?
screwbash wrote:da about wah 250 /300 blocks plus post and trench ? for $25000. how allyuh cud pay dat an allow men tuh dig out yuh eye. it have real Spanish here that doing that wuk, local wah charge $350 ah day for a labourer and dem spanish doing it for $150 /$200 and dey wuking and going to a next wuk, dem aint stopping for lunch for ah hour or running by the shop every minute like locals. local wah charge me $4000 labour to put up two block height, full with dirt and concrete a floor 17'x10' and the man take 4 days to do the wuk, next piece same size ah give 2 spanish pay them $200 ah day and dey take 2 half days and floor concrete for $1200 labour.
Return to “Ole talk and more Ole talk”
Users browsing this forum: shake d livin wake d dead and 257 guests