Approval of building plans
Applicants are required to:
1 Have plans drawn by a qualified draughtsman or architect
2 Submit three (3) completed copies of the drawings along with an application form available from the Town and Country Planning Division.
3 Applicants should check with the Corporation (Building and Inspector’s Office) two (2) weeks after receiving an acknowledgement letter.
4 If there are corrections to be made to the plan, a Notice of Defect will be sent to the applicant.
5 In cases where the area is served by a sewage system, the applicant will be required to produce the isometric (plumbing) drawings approved by the Water and Sewage Authority (WASA).
6 The applicant/owner is required to produce identification when collecting plans
Time frame for delivery: 2 months
Fees vary: Interested persons are asked to call the Municipal Corporation for information.
Contact Building Inspector at the respective Municipal Corporation.